The
ships of this project are intended for storage, preparation, transportation and
delivery to submarines and warships of weapons for various purposes, including
missiles, at sea. In total in Nikolaev in different modifications 7 vessels of
this project were built.
General Ryabikov laid down at Shipyard No.444 named after I.Nosenko, Nikolaev
(yard No.627), commissioned on December 1978 and was assigned to the Black Sea
Fleet. Decommissioned on December 2020, and cut into metal in September
2021 in Sevastopol. Specifications |
Displacement (tons): | Standard: | 3000 |
Full load: | 4340 |
Dimensions (m): | Length: | 112,6 |
Beam: | 15,5 |
Draft: | 4,15 | Speed
(knots): | 13 | Range: | 2000
nmi (10 knots) | Autonomy (days): | 15 |
Propulsion: | 2x2000 hp 37DR
diesels, 2 fixed pitch propellers, 4x224 kW diesel generators |
Armament: | 1x2 57 mm AK-725
–MR-103 Bars fire control system | Electronics: |
MR-302 Rubka air/surface search radar, Don navigation radar, MG-7 Braslet anti-saboteur
sonar | Complement: | 154
(19 officers) |
|